HomeNews

Factory Dec 28, 2025

Heavyweight T-Shirt Manufacturer in China: Buyer Checklist

heavyweight-t-shirt-manufacturer-in-china-buyer-checklist
Heavyweight Factory Infrastructure

Practical Tips for Buyers

If you are planning an order and want these points built into your quotation, send your design or tech pack to our team and we will reply with a detailed quote within 1–2 working days.

class="mt-10 bg-blue-50 border border-blue-100 rounded-2xl p-8">

Key Takeaways

Need a factory quote for your order? Send your design or tech pack to our team and we will reply within 1–2 working days.

More Manufacturing Insights

AQL 2.5 Explained: How We Inspect Bulk Clothing Orders Screen Printing vs DTF vs Puff Print: Cost, Durability & Use Cases Pre-Shrunk Fabric: Why Premium Brands Never Skip This

Frequently Asked Questions

What is the MOQ?

Generally 100 pieces per style for selected products, depending on fabric and finish.

Can I order samples?

Yes, and the sample fee is credited back against your bulk order.

What is the lead time?

Sampling takes about 7-10 days; bulk production about 25-40 days, depending on quantity and finish.

Related Articles

From Checklist to Production

Use this buyer checklist before sending a deposit: confirm fabric GSM, sample approval, MOQ, inspection standard and shipping terms. Once these are locked, production follows the approved sample.

Review our heavyweight T-shirt production or see low MOQ manufacturing.